
ADSDU8IOB / ADSDU8IOBW MOUNTING BASE 8200-0600-04, REV. A
INSTALLATION GUIDE
2 of 6
Cautions
• The maximum length of power cable allowed
between the Class 2 LPS (low voltage) ac
source, such as a J-box, and the dome is 250m
(820ft).
• Do not run data and power cables adjacent to or
in the same conduit as line voltage mains
power.
• SensorNet 485 networks require 22 AWG
unshielded cable. Do not exceed 32 devices per
cable run.
• RS-422 networks require 22 AWG shielded
cable. Do not exceed 10 devices per cable run.
• Manchester networks require 18AWG shielded
cable. Do not exceed three devices per cable
run.
• Always terminate the camera dome connected
at the end of a cable run.
• The I/O board is electrostatic-sensitive! Use a
ground strap when handling the I/O board.
• The spring finger connector on the I/O board
has a dust cover. DO NOT remove this cover
until you have installed the dome’s base. It
protects delicate spring fingers. Keep the dust
cover for use should you have to ship the
mounting base back to the manufacturer.
• Screw terminal connectors on the I/O board are
delicate! Use a jeweler’s 2.5mm (0.1in) slotted
screwdriver to tighten connector screws. DO
NOT over tighten these screws.
Installation
This section explains how to attach the base and
wire the I/O board. Once done, refer to installation
and service Guide for the dome camera for further
instructions. Perform procedures in the following
order:
1. Detach the I/O board from the base (page
3).
2. Attach the base indoors to a:
• Tile ceiling (page
3)
• Hard ceiling (page
3)
• Mounting structure (page
4).
3. Wire the I/O board (page
4).
4. Reattach the I/O board (page
6).
Before You Begin
Please read the following to ensure a smooth and
successful installation.
You must:
• Have electrical work comply with latest national
electrical code, national fire code, and all
applicable local codes and ordinances.
• Coordinate work with other trades to avoid
interference.
• Verify existing site conditions and coordinate
with the owner’s representative and appropriate
utilities as required.
• Obtain copies of all related plans, specifications,
shop drawings and addenda to schedule and
coordinate related work.
• Thoroughly review the project to ensure that all
work meets or exceeds the above requirements.
Bring alleged to the attention of the CCTV
Project Coordinator.
Tools Required
• Phillips screwdriver
• Power drill with 3.2mm (1/8in), 6.4mm (1/4in),
9.5mm (3/8in), and 19.5mm (3/4in) drill bits
• Hammer
• Socket wrench with 152mm (6in) extension, and
5.5mm and 10mm sockets
• Jeweler’s 2.5mm (0.1in) slotted screwdriver (for
wire connections)
• 18-14AWG and 22-20AWG wire strippers
• Vacuum and broom.
Parts Required
Item Qty Part Number
Base with I/O Board 1 0101-0175-01/02
Install Kit 1 0352-0324-01
Anchor, Toggle 2 2880-0073-01
Screw, STAP, 4.2x32 PH 2 5810-4091-120
Washer, Flat, M4 2 5842-0300-020
Nut, Locking, M3 2 5826-0200-020
Komentáře k této Příručce